17 Central Sacramento California Landing Photo
17 Central
  • 17 Central Sacramento Left Top Square17 Central Sacramento Left Bottom Square
  • Project Overview:

    The 1430 Q Street Apartments is a modern residential development in the heart of Sacramento, designed to provide high-quality urban living with a focus on sustainability, convenience, and contemporary design. Located in the vibrant Midtown district, the project offers a mix of thoughtfully designed apartment units that cater to professionals, students, and individuals seeking a dynamic, walkable lifestyle. With its proximity to restaurants, shopping, public transit, and cultural landmarks, 1430 Q Street Apartments enhances the city’s growing residential offerings while promoting smart growth and community engagement.

17 Central Sacramento Right Top Square17 Central Sacramento Right Bottom Square

Project Objectives

  • Urban Infill Development: Maximize the use of centrally located land to create new housing opportunities in Sacramento’s thriving Midtown neighborhood.
  • Modern, Sustainable Living: Implement eco-friendly design principles, energy-efficient systems, and high-quality construction materials.
  • Community and Connectivity: Foster a pedestrian-friendly environment with easy access to public transportation, retail, and entertainment.
  • Luxury and Comfort: Offer residents premium amenities and contemporary living spaces tailored for modern lifestyles.

Project Scope

  • Residential Units: A mix of studio, one-bedroom, and two-bedroom apartments featuring high-end finishes, smart home technologies, and open floor plans.
  • Amenities and Common Areas: Rooftop lounge, fitness center, co-working spaces, bike storage, and resident gathering areas.
  • Sustainability Features: Energy-efficient lighting, water-saving fixtures, EV charging stations, and solar integration where feasible.
  • Transit and Walkability: Proximity to light rail, bus lines, and bike-friendly infrastructure to encourage alternative transportation.
  • Retail and Mixed-Use Spaces: Ground-floor retail or commercial spaces to activate the streetscape and provide convenient services for residents.

Construction Timeline

  • Phase 1 – Planning and Permitting: Architectural design, zoning approvals, and community engagement.
  • Phase 2 – Site Preparation and Foundation Work: Land clearing, utility installation, and foundational development.
  • Phase 3 – Vertical Construction: Building structure, interior framing, and installation of mechanical and electrical systems.
  • Phase 4 – Finishing and Landscaping: Interior detailing, final inspections, and activation of public spaces.
  • Phase 5 – Leasing and Occupancy: Official opening and move-in for residents, along with commercial tenant activation.

Sustainability and Compliance

  • Green Building Practices: Adherence to LEED or equivalent energy efficiency standards.
  • Smart Energy Use: Integration of solar panels, high-performance windows, and sustainable building materials.
  • Transportation and Mobility Compliance: Support for public transit use, bike infrastructure, and walkability in alignment with Sacramento’s urban planning goals.

Community Impact

The 1430 Q Street Apartments contributes to Sacramento’s urban revitalization by providing high-quality housing in a sought-after Midtown location. It supports economic growth through local business engagement and enhances neighborhood vibrancy with modern, sustainable living spaces. By prioritizing smart growth and walkability, the project aligns with the city’s long-term vision for a more connected, thriving downtown core.

  • Year

    2022

  • Location

    Sacramento, California

  • Category

    Multi-Family

  • Project Manager

    Dana Jones

business img
Your Goals Define Our Approach

Unlock your project's potential with expert engineering tailored to your vision.