Logisticenter Enterprise Landing Photo
Logisticenter @ Enterprise
  • Logisticenter Left Top SquaresLogisticenter Left Bottom Squares
  • Project Overview

    The Logisticenter @ Enterprise project in Hayward, California, was designed to provide a modern, state-of-the-art logistics and distribution facility to support the growing demand for e-commerce and industrial operations in the region. The development aims to provide flexible and efficient spaces for businesses in need of high-quality warehousing, office, and distribution solutions. Strategically located in the heart of the Bay Area, the Logisticenter facility offers superior access to key transportation routes, ensuring that businesses can efficiently distribute goods and services across the region.

Logisticenter Right Top SquaresLogisticenter Right Bottom Squares

Project Objectives

  • Provide High-Quality Logistics Space: Develop a versatile logistics center capable of supporting a variety of industrial and commercial uses, including warehousing, light manufacturing, and distribution.
  • Support E-Commerce and Supply Chain Needs: Address the increasing demand for e-commerce fulfillment centers with modern facilities designed to streamline operations and optimize supply chain management.
  • Enhance Accessibility and Connectivity: Leverage the strategic location to provide easy access to major highways, rail systems, and the Port of Oakland for regional and national distribution.
  • Incorporate Sustainable Building Practices: Utilize green building technologies and energy-efficient systems to reduce the environmental footprint and operational costs of the facility.
  • Offer Flexibility for Multiple Tenants: Design the space to be adaptable for a wide range of businesses and industries, with customizable spaces to accommodate tenants’ specific needs.

Project Scope

  • Logistics and Distribution Facilities: The project includes the construction of large, high-ceiling warehouse spaces with advanced infrastructure to support storage, inventory management, and distribution operations.
  • Office and Administrative Spaces: The development features modern office spaces for tenants’ administrative functions, offering flexible layouts for businesses in need of office areas alongside their warehouse operations.
  • Loading Docks and Truck Access: The facility includes multiple loading docks with easy access for large trucks, as well as ample space for maneuvering and unloading goods, optimizing logistics operations.
  • Sustainable Design Features: The building incorporates energy-efficient lighting, HVAC systems, and materials that reduce energy consumption and environmental impact. The site also includes sustainable landscaping and stormwater management systems.
  • Parking and Site Improvements: The site provides ample parking for both employees and trucks, with well-maintained roads and infrastructure designed to handle the daily flow of logistics traffic.
  • Security Features: The facility includes modern security systems such as 24/7 surveillance cameras, gated access points, and on-site security personnel to ensure the safety and security of the property and its tenants.

Construction Timeline

The Logisticenter @ Enterprise project was completed in multiple phases, ensuring that it met the growing needs of the market while minimizing disruption to surrounding areas:

  • Phase 1 – Design and Planning: Finalized conceptual designs, site evaluations, and necessary permitting processes with local authorities.
  • Phase 2 – Site Preparation: Site grading, utility installation, and infrastructure development, including roadways and drainage systems to support the facility.
  • Phase 3 – Building Construction: Construction of the warehouse, office spaces, and loading docks, with the installation of energy-efficient systems and high-quality infrastructure to support logistics operations.
  • Phase 4 – Installation of Security and Tech Systems: Integration of advanced security systems, such as surveillance cameras, access control, and automated management systems for tenants.
  • Phase 5 – Final Inspections and Leasing: Final inspections for safety and compliance, followed by tenant move-in and the start of leasing operations.

Sustainability and Compliance

  • Green Building Practices: The project used sustainable materials and energy-efficient systems, including LED lighting and high-efficiency HVAC systems, to reduce energy use and operational costs.
  • Compliance with Zoning and Safety Standards: The facility meets local building codes, zoning regulations, and safety requirements, ensuring it operates within the legal framework and provides a safe environment for tenants.
  • Water Conservation: Landscaping was designed with drought-resistant plants and water-efficient irrigation systems to minimize water usage, in line with California’s sustainability goals.
  • Low Environmental Impact: The facility’s design minimizes its carbon footprint with environmentally friendly construction methods and a focus on long-term operational efficiency.

Community Impact

The Logisticenter @ Enterprise provides a valuable resource for businesses in Hayward and the surrounding areas, supporting a variety of industries with flexible and modern logistics solutions. Its strategic location near major highways and the Port of Oakland makes it an ideal site for regional and national distribution, enhancing the local economy by attracting tenants in need of high-quality warehousing and distribution facilities. Furthermore, the incorporation of sustainable building practices ensures that the facility operates efficiently while minimizing its environmental impact, benefiting the community and the broader region.

The development of this logistics center also helps create local jobs and supports businesses in their efforts to streamline supply chains and expand their operations. By providing modern, scalable spaces that can accommodate businesses of all sizes, the project strengthens the area’s position as a hub for logistics and industrial activity.

  • Year

    2025

  • Location

    Hayward, California

  • Category

    Industrial

  • Project Manager

    Dana Jones

business img
Your Goals Define Our Approach

Unlock your project's potential with expert engineering tailored to your vision.